CiteNScope — Scholarly Index & Analytics
Discover / IJRBSPUBLICATION RECORD

Factors affecting time and cost in road construction projects at a South African municipality

Monwabisi Siwakhile Xegwana ORCID ↗ · Michael Twum-Darko · Robertson K. Tengeh ORCID ↗

International Journal of Research in Business and Social Science · 2024 · Vol. 13 / Issue 6 · 405-413

Research reach

Publication metrics

External links open provider records or DOI searches. Provider counts are not combined. Mendeley readership measures saves, not citations.

Dimensions

Live provider badge. If unavailable, use the Dimensions link above.

CROSSREF CITATIONS1

Observed 21 Oct 2026, 07:22 UTC

OpenAlex · Citations1Cached provider observation

Observed 21 Oct 2026 07:22 UTC

Mendeley · Readers19Cached provider observation

Observed 22 Oct 2026 01:30 UTC

OpenAlex and Mendeley observations refresh on article visits, at most once per 24 hours. Unavailable data is not zero. Google Scholar opens a DOI search.

OpenAlex / Citation year

Annual citations to this article

View provider totals ↑

Citations received by this article, grouped by the year of the citing work. Crossref and OpenAlex lifetime totals remain separate in Publication metrics.

2017–2026 Annual history last updated:

Citations received

OpenAlex · year of the citing work

OpenAlex

Hover over a year or focus the chart and use arrow keys to inspect values.

2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.

View data & coverage

2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Years beyond a saved observation’s window remain unknown (—). Older citations are excluded, so this chart’s sum may differ from the OpenAlex lifetime total. The date above belongs to this annual history; an unsuccessful refresh keeps the previous observation.

Overview

Abstract

The South African construction sector is confronted by significant obstacles, particularly concerning cost overruns and project delays within the road construction sphere. This research sought to investigate the factors impacting cost and duration in road construction projects under the purview of a KwaZulu-Natal municipality. A qualitative research approach was adopted to explore this phenomenon. A sample size of 27 participants was selected from a population of 171 for in-depth semi-structured interviews. Critical determinants of cost overruns and delays were identified as ineffective communication, suboptimal procurement processes, deficient stakeholder management, and shortcomings in project execution and personnel capabilities. This study offers valuable insights into the relationship between cost, time, and the successful delivery of road projects within the local government context. By illuminating these factors, the research contributes to a deeper theoretical understanding, informs evidence-based policy development, and provides actionable recommendations for enhancing project management practices.

Authors & affiliations

Monwabisi Siwakhile Xegwana
Affiliation not supplied

Michael Twum-Darko
Affiliation not supplied

Robertson K. Tengeh
Affiliation not supplied

Deposited references

Supplied references, not a list of publications citing this article.

DOI: 10.5267/j.jpm.2023.6.002

DOI: 10.46743/2160-3715/2018.2994

Alfakhri, A., Ismail, A., Khoiry, M. A., Arhad, I., & Irtema, H. I. M. (2017). A conceptual model of delay factors affecting road construction projects in Libya. Journal of Engineering Science and Technology, 12(12), 3286-3298.

Algozzine, B., & Hancock, D. (2017). Doing case study research: A practical guide for beginning researchers. Teachers College Press.

DOI: 10.30880/ijscet.2020.11.02.025

DOI: 10.5130/AJCEB.v21i4.7858

Alzoubi, H. M. (2022). BIM as a tool to optimize and manage project risk management. International Journal of Mechanical Engineering, 7(1), 6307-6323.

DOI: 10.35940/ijeat.B3880.129219

DOI: 10.47672/ijpm.1638

DOI: 10.3390/ijerph17114110

DOI: 10.47852/bonviewJCCE2202272

DOI: 10.11648/j.jccee.20220703.13

Choge, J. K., & Muturi, W. M. (2014). Factors affecting adherence to cost estimates: A survey of construction projects of Kenya National Highways Authority. International Journal of Social Sciences and Entrepreneurship, 1(11), 689-705.

DOI: 10.1016/j.ijpe.2020.107955

DOI: 10.46743/2160-3715/2016.2243

DOI: 10.1108/JEDT-04-2021-0211

DOI: 10.1108/JEDT-11-2015-0075

DOI: 10.1016/j.heliyon.2021.e06826

DOI: 10.1353/csd.2007.0003

Harrison, H., Birks, M., Franklin, R., & Mills, J. (2017, January). Case study research: Foundations and methodological orientations. Forum Qualitative Sozialforschung/Forum: Qualitative Social Research, 18(1).

DOI: 10.3390/app10165506

DOI: 10.35942/jbmed.v3i1.166

DOI: 10.2174/18744478-v16-e2208190

DOI: 10.1080/20476965.2017.1403674

DOI: 10.56201/wjfir.v6.no1.2022.pg49.61

Maxwell, J. A. (2012). Qualitative research design: An interactive approach. Sage Publications.

DOI: 10.29121/granthaalayah.v7.i2.2019.990

DOI: 10.31272/jeasd.27.4.7

DOI: 10.1080/13814788.2017.1375091

DOI: 10.1016/j.ijpe.2021.108260

DOI: 10.32738/JEPPM.201401.0003

Oluwajana, S. M., Ukoje, J. E., Okosun, S. E., & Aje, I. O. (2022). Factors affecting time and cost performance of road construction projects in Nigeria. African Journal of Applied Research, 8(1), 72-84. http://dx.doi.org/10.26437/ajar.03.2022.5

Patton, M. Q. (2014). Qualitative research & evaluation methods: Integrating theory and practice. SAGE Publications.

DOI: 10.1177/1049732317697102

DOI: 10.5772/intechopen.95009

DOI: 10.1088/1757-899X/1255/1/012011

DOI: 10.5267/j.jpm.2023.5.001

DOI: 10.1007/978-981-19-4739-1_47

DOI: 10.21315/jcdc2020.25.1.7

DOI: 10.1061/(ASCE)CP.1943-5487.0000262

Tshering, Y., Wangmo, S., Choden, R., & Lhendup, T. (2020). Factors affecting time overrun in construction projects in Bhutan. Journal of Education and Practice, 11(29), 1-7.

DOI: 10.18820/24150487/as27i1.5

DOI: 10.1177/03611981221087229

DOI: 10.30880/ijie.2018.10.09.032

Vahed, F. (2022). Causes and effects of delays in road construction projects in South Africa (Master's thesis, Faculty of Engineering and the Built Environment).

DOI: 10.1186/s12874-018-0594-7

DOI: 10.3390/app11125531

DOI: 10.5267/j.jpm.2023.7.001