CiteNScope — Scholarly Index & Analytics
Discover / IJRBSPUBLICATION RECORD

Recalibration perceptions of risk management challenges within the built environment at the national road infrastructure project within eThekwini Municipality

Charles Tony Simphiwe Ngwenya · Bokang Sithole ORCID ↗

International Journal of Research in Business and Social Science · 2025 · Vol. 14 / Issue 4 · 537-545

Research reach

Publication metrics

External links open provider records or DOI searches. Provider counts are not combined. Mendeley readership measures saves, not citations.

Dimensions

Live provider badge. If unavailable, use the Dimensions link above.

CROSSREF CITATIONS0

Observed 21 Oct 2026, 07:22 UTC

OpenAlex · Citations0Cached provider observation

Observed 21 Oct 2026 07:23 UTC

Mendeley · Readers2Cached provider observation

Observed 22 Oct 2026 04:25 UTC

OpenAlex and Mendeley observations refresh on article visits, at most once per 24 hours. Unavailable data is not zero. Google Scholar opens a DOI search.

OpenAlex / Citation year

Annual citations to this article

View provider totals ↑

Citations received by this article, grouped by the year of the citing work. Crossref and OpenAlex lifetime totals remain separate in Publication metrics.

2017–2026 Annual history last updated:

Citations received

OpenAlex · year of the citing work

OpenAlex

Hover over a year or focus the chart and use arrow keys to inspect values.

2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.

View data & coverage

2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Years beyond a saved observation’s window remain unknown (—). Older citations are excluded, so this chart’s sum may differ from the OpenAlex lifetime total. The date above belongs to this annual history; an unsuccessful refresh keeps the previous observation.

Overview

Abstract

The study explores contributory factors that make a fundamental contribution within the built environment pertaining to the management of the cognitive perceptions and attitude of risk with its concomitant insights, contributions and expectations. The built environment infrastructure is a fundamental component of economic prosperity as the research focuses on the construction of national roads and the associated risks, both internal and external, to primary and secondary stakeholders. The research purpose is to illuminate those factors within the risk management discipline which are critical from the prism of the employees and other indirect contracting personnel who are the main contributors within the high-risk environment of the built environment. The study employed the interpretivist philosophy, which is synonymous with the inductive approach of the qualitative methodology. The purposive sampling technique was adopted to solicit the expertise, insights, and experiences of approximately twenty respondents who held management and supervisory portfolios in the organisation. The interview channel was the preferred research instrument used to collect and contribute towards the extrapolation of data from the study respondents. The findings in the study illuminate the significance of the prioritisation of the culture, behaviour and actionable tendencies that seek to eliminate and mitigate the risk permutations in these perilous and often life-threatening safety and hazardous construction sites. The study concluded by acknowledging the organization-wide responsibility and compliance with the manageable risk appetite and also illuminated the significance of monitoring and evaluating the perceptions and attitudes of personnel involved in these precarious and yet fundamental contributors of economic prosperity pertaining to infrastructure improvement, development and modernisation.

Keywords: {'name': 'Risk appetite, built environment, risk mitigation, safety culture'}

Authors & affiliations

Charles Tony Simphiwe Ngwenya
Affiliation not supplied

Bokang Sithole
Affiliation not supplied

Deposited references

Supplied references, not a list of publications citing this article.

DOI: 10.1016/j.ssci.2017.10.026

DOI: 10.1007/s11629-023-8388-8

DOI: 10.1007/s11629-023-8388-8

DOI: 10.1061/(ASCE)EI.1943-5541.0000193

DOI: 10.1080/01446193.2021.1904516

DOI: 10.1088/1757-899X/271/1/012042

DOI: 10.1088/1757-899X/271/1/012042

Berg, H. P. (2010). Risk management: procedures, methods and experiences. Reliability: Theory & Applications, 5(2 (17)), 79–95.

DOI: 10.1037/a0037916

DOI: 10.1016/j.iref.2018.01.015

Chapman, C., & Ward, S. (2019). How to Manage Project Opportunity and Risk: Why Uncertainty Management Can Be a Much Better Approach Than Risk Management (2nd ed.). Wiley.

DOI: 10.1016/j.ijproman.2017.02.018

DOI: 10.3390/ijerph16020228

DOI: 10.1191/1478088706qp063oa

Cohen, M., Gumede, A., & Vecchiatti, P. (2017). KPMG, McKinsey Feel the Heat Over South Africa Graft Scandal.

https://www.bloomberg.com/news/articles/2017-09-18/kpmg-mckinsey-feel-the-heat-as-graft-scandal-rocks-south-africa

Committee of Sponsoring Organizations of the Treadway Commission, 2004, EnterpriseRisk Management—Integrated Framework. Online: http://www.coso.org/ (Accessed on September 19, 2024).

Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches. (4th ed.) Sage Publishing

Creswell, J. W., & Creswell, J. D. (2023). Research design: Qualitative, quantitative, and mixed methods approaches. Thousand Oaks, California: SAGE.

DOI: 10.1016/j.ijproman.2017.02.004

DOI: 10.4236/me.2014.54036

DOI: 10.1146/annurev-financial-111414-125820

DOI: 10.1080/0965254X.2015.1076879

DOI: 10.1111/rmir.12028

Gido, J., Baker, R. & Clements, J. (2018). Successful Project Management. 7th Edition. Stamford. Cengage Learning.

DOI: 10.1037/apl0000380

DOI: 10.4324/9781315235448

DOI: 10.4135/9781849200387.n20

DOI: 10.1186/s12913-018-2864-9

DOI: 10.1080/10429247.2009.11431803

DOI: 10.4135/9781849200387.n10

DOI: 10.1108/QRJ-12-2018-0012

DOI: 10.1080/15623599.2017.1326299

DOI: 10.1016/j.jclepro.2020.125223

DOI: 10.1016/j.ssci.2021.105240

Messier Jr, W. F., Glover, S. M., & Prawitt, D. F. (2017). Auditing & assurance services: A systematic approach. McGraw-Hill.

DOI: 10.1017/sjp.2014.55

Powell, W. W., & DiMaggio, P. J. (Eds.). (2012). The new institutionalism in organizational analysis. University of Chicago Press.

Prieto, R. (2022). Enterprise Risk Management in the Engineering and Construction Industry. PM World Journal. URL: http://www.pmworldjournal.com/

DOI: 10.1016/j.proeng.2016.11.637

Saunders, L. W., Kleiner, B. M., McCoy, A. P., Mills, T., Lingard, H., Cooke, T., ... & Wakefield, R. (2012). Identifying Safety Critical Decision Points in the Construction Lifecycle. In IIE Annual Conference. Proceedings (p. 1). Institute of Industrial and Systems Engineers (IISE).

Saunders, M., Lewis, P., & Thornhill, A. (2016). Research methods for business students (Seventh). Nueva York: Pearson Education.

Scott, W.R. (2014). Institutions and organizations. Thousand Oaks: Sage Publications.

DOI: 10.1016/j.proeng.2017.11.036

DOI: 10.1016/j.ssci.2017.02.011

DOI: 10.1016/j.ssci.2020.104990

DOI: 10.1093/acprof:oso/9780199601936.001.0001

Turner, R., Crawford, L., Pollack, J. (2020). Perceptions of time on projects. European Academy of Management conference, 04-06 Dec, Dublin, Ireland.

DOI: 10.1016/j.aap.2019.105350

DOI: 10.1108/ECAM-09-2014-0117

DOI: 10.1016/j.ssci.2015.04.001

DOI: 10.1007/s12205-018-1924-3