CiteNScope — Scholarly Index & Analytics
Discover / IJRBSPUBLICATION RECORD

Assessment of project management practices and sustainable development of oil producing communities: A tale of Ilaje Local Government Area, Ondo State, Nigeria

Adeniyi Odunayo Onafadeji · Dajili Christiana Ojone

International Journal of Research in Business and Social Science · 2026 · Vol. 14 / Issue 10 · 164-173

Research reach

Publication metrics

External links open provider records or DOI searches. Provider counts are not combined. Mendeley readership measures saves, not citations.

Dimensions

Live provider badge. If unavailable, use the Dimensions link above.

CROSSREF CITATIONS0

Observed 21 Oct 2026, 07:22 UTC

OpenAlex · Citations1Cached provider observation

Observed 21 Oct 2026 07:23 UTC

Mendeley · Readers—No verified count available

OpenAlex and Mendeley observations refresh on article visits, at most once per 24 hours. Unavailable data is not zero. Google Scholar opens a DOI search.

OpenAlex / Citation year

Annual citations to this article

View provider totals ↑

Citations received by this article, grouped by the year of the citing work. Crossref and OpenAlex lifetime totals remain separate in Publication metrics.

2017–2026 Annual history last updated:

Citations received

OpenAlex · year of the citing work

OpenAlex

Hover over a year or focus the chart and use arrow keys to inspect values.

2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.

View data & coverage

2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Years beyond a saved observation’s window remain unknown (—). Older citations are excluded, so this chart’s sum may differ from the OpenAlex lifetime total. The date above belongs to this annual history; an unsuccessful refresh keeps the previous observation.

Overview

Abstract

This research investigates the influence of project management practices (PMP) on sustainable development among oil-producing villages in the Ilaje Local Government Area of Ondo State, Nigeria. This study examines the impact of Project Management Practices (PMPs)—including planning, implementation, monitoring, and evaluation—on the sustainable development (SD) dimensions of the environmental, economic, and social aspects of inhabitants in oil-producing areas within Ilaje LGA, Ondo State. Data were gathered from 154 household heads through structured questionnaires using a survey methodology and analysed with descriptive and inferential statistics, including multiple linear regression. The findings indicated a modest level of PMP, with Mean Index Scores between 2.14 and 2.44, signifying restricted community engagement. The results of the multiple linear regression indicate that the construct and implementation significantly impacted all three dimensions of sustainability: environmental, economic, and social. This indicates that financial benefits are received by the residents of the host community, notwithstanding their limited participation as casual workers during project execution. Nevertheless, oil companies exhibit minimal care for the aspirations of the populace concerning the impact of their projects on the local environment.  The study's geographic limitations restrict generalisability, indicating the necessity for further extensive comparative research. It advises oil companies to use inclusive project management frameworks that improve stakeholder engagement, therefore promoting sustainable socio-economic development and environmental stewardship in host communities

Keywords: {'name': 'Project Management, Sustainable Development, Exploration, Exploitation, Niger Delta'}

Authors & affiliations

Adeniyi Odunayo Onafadeji
University of South Africa

Dajili Christiana Ojone
Department of Project Management Technology, School of Logistics and Innovation Technology, Federal University of Technology, Akure

Deposited references

Supplied references, not a list of publications citing this article.

DOI: 10.1177/0263774X16661720

DOI: 10.1016/j.proeng.2018.01.136

Asare, A. B. (2017). Project management for developing countries: Back to basics. Routledge.

DOI: 10.1007/s40808-019-00636-5

Benegahutu, T., Ngarambe, P., & Safari, V. (2020). Influence of project management practices on project success in Rwanda: The case of Girinka project in Runda sector, Kamonyi district. European Journal of Management and Marketing Studies, 5(3), 91–105. https://doi.org/10.46827/ejmms.v5i3.860

DOI: 10.3200/JOEB.80.1.10-16

DOI: 10.4236/nr.2014.514076

DOI: 10.2307/41165746

DOI: 10.1016/j.spc.2021.08.020

DOI: 10.5130/AJCEB.v21i1.7170

Imobighe, T. A., Bassey, C. O., & Asuni, J. B. (2002). Conflict and instability in the Niger Delta: The Warri case. Spectrum Books.

Jabridep Nigeria Limited. (2020). Environmental and social impact assessment (ESIA) of Ondo Deep-Sea Port for Ondo State Government (Draft final). Federal Ministry of Environment, Nigeria. https://ead.gov.ng/wp-content/uploads/2020/08/xx-Final-Final-SUBMITTED-EIA-DEEP-SEA-DRAFT-FINAL-DOCUMENT-3IST-MAY-2020.pdf

DOI: 10.20533/ijsed.2046.3707.2024.0072

DOI: 10.21511/ppm.20(3).2022.21

DOI: 10.2478/remav-2018-0016

Magagan, K. C., & Ngugi, L. (2021). Influence of project management practices on performance of projects in Unilever Kenya Ltd. International Academic Journal of Information Sciences and Project Management, 3(6), 392–418.

DOI: 10.1088/1757-899X/342/1/012091

DOI: 10.1016/B978-0-12-809399-3.00024-0

DOI: 10.1186/s12939-024-02248-7

Njau, D. N., & Omwenga, J. (2019). Effect of project management practices on effective implementation of building construction projects in Kenya. International Journal of Entrepreneurship and Project Management, 4(3), 1–16.

DOI: 10.14738/assrj.84.9976

DOI: 10.30574/gscarr.2024.20.1.0262

Oladipupo, A. O., & Ibadin, P. O. (2016). Indirect taxes and infrastructural development in Nigeria. Igbinedion University Journal of Accounting, 2(1), 331–353.

DOI: 10.1080/01446191003674519

DOI: 10.21203/rs.3.rs-7842826/v1

DOI: 10.1146/annurev.energy.28.050302.105617

DOI: 10.61426/sjbcm.v9i4.2432

Pinto, J. K., & Slevin, D. P. (1988). Project success: Definitions and measurement techniques. Project Management Journal, 19(1), 67–72.

DOI: 10.1016/j.energy.2018.06.027

Rwanda Governance Board. (2018). Assessing Girinka Project (2006–2016): Citizen perspectives. Rwanda Governance Board.

Silvius, G., Schipper, R. O. N., & Planko, J. (2012). Sustainability in project management. Gower Publishing.

DOI: 10.1016/j.marpolbul.2014.03.002