Evaluating the Performance of Road Construction Contracts: A Case Study of the Roads Authority, Namibia
Redemputus Tuutaleni Malumbu ORCID ↗ · Helvi Ndilimeke Petrus ORCID ↗
International Journal of Research in Business and Social Science · 2026 · Vol. 15 / Issue 5 · 269-276
Publication metrics
External links open provider records or DOI searches. Provider counts are not combined. Mendeley readership measures saves, not citations.
Dimensions
Live provider badge. If unavailable, use the Dimensions link above.
Observed 21 Oct 2026, 07:22 UTC
Observed 21 Oct 2026 07:23 UTC
OpenAlex and Mendeley observations refresh on article visits, at most once per 24 hours. Unavailable data is not zero. Google Scholar opens a DOI search.
Citations received by this article, grouped by the year of the citing work. Crossref and OpenAlex lifetime totals remain separate in Publication metrics.
2017–2026 Annual history last updated:
Citations received
OpenAlex · year of the citing work
Hover over a year or focus the chart and use arrow keys to inspect values.
2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.
View data & coverage
2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Years beyond a saved observation’s window remain unknown (—). Older citations are excluded, so this chart’s sum may differ from the OpenAlex lifetime total. The date above belongs to this annual history; an unsuccessful refresh keeps the previous observation.
Abstract
This paper evaluates the performance of road construction contracts awarded by the Roads Authority (RA) of Namibia, addressing the persistent project delays, cost overruns, and contractor non-performance that have continued despite the enactment of the Public Procurement Act 15 of 2015. The study examines three interrelated dimensions of contract performance: the role of procurement processes in contractor selection, the effectiveness of monitoring and evaluation systems, and the influence of external factors on project outcomes. A qualitative case study design, underpinned by a constructivist research philosophy, was adopted. Data were collected through semi-structured questionnaires administered to 27 purposively selected participants, comprising 10 Roads Authority procurement officers and project managers and 17 contractors who undertook road projects between 2020 and 2025. Responses were analysed in ATLAS.ti through inductive open, axial, and selective coding, yielding 68 codes consolidated into 19 clusters and five overarching themes. The findings show that contract performance is undermined by (i) procurement process limitations, particularly lowest-bid bias and unverifiable paper-based capacity assessment; (ii) monitoring and supervision gaps linked to understaffing and reactive contract management; (iii) institutional capacity constraints; (iv) external pressures, most notably delayed client payments and political interference; and (v) contractor-side weaknesses including financial mismanagement and capacity misrepresentation. These findings are interpreted through Principal-Agent Theory, the Resource-Based View, and Project Management Theory, which jointly demonstrate that performance failure is multi-causal rather than attributable to any single determinant. The study recommends reforming contractor selection criteria, introducing performance-based contracting, strengthening monitoring capacity through digital systems, and improving payment discipline, offering an empirically grounded contribution to public procurement and infrastructure contract management scholarship in developing countries.
Keywords: {'name': 'road construction contracts'}, {'name': 'public procurement'}, {'name': 'contract performance'}, {'name': 'Roads Authority of Namibia'}, {'name': 'contractor non-performance'}
Authors & affiliations
Redemputus Tuutaleni Malumbu
Namibia University of Science and Technology
Helvi Ndilimeke Petrus
Namibia University of Science and Technology
Deposited references
Supplied references, not a list of publications citing this article.
No reference list supplied.