The Impact of Resource Management on Water Supply Project Performance
Ishimwe Hertier Sauveur · Amolo Elvis Juma Amolo
International Journal of Finance & Banking Studies · 2025 · Vol. 14 / Issue 1 · 186-194
Publication metrics
External links open provider records or DOI searches. Provider counts are not combined. Mendeley readership measures saves, not citations.
Dimensions
Live provider badge. If unavailable, use the Dimensions link above.
Observed 21 Oct 2026, 00:21 UTC
Observed 21 Oct 2026 00:22 UTC
OpenAlex and Mendeley observations refresh on article visits, at most once per 24 hours. Unavailable data is not zero. Google Scholar opens a DOI search.
Citations received by this article, grouped by the year of the citing work. Crossref and OpenAlex lifetime totals remain separate in Publication metrics.
2017–2026 Annual history last updated:
Citations received
OpenAlex · year of the citing work
Hover over a year or focus the chart and use arrow keys to inspect values.
2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.
View data & coverage
2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Years beyond a saved observation’s window remain unknown (—). Older citations are excluded, so this chart’s sum may differ from the OpenAlex lifetime total. The date above belongs to this annual history; an unsuccessful refresh keeps the previous observation.
Abstract
Resource management has become a critical focus globally as nations strive for sustainability and efficiency in utilizing their natural assets. Despite significant efforts to improve water accessibility in Rwanda, water supply projects continue to face high failure rates, particularly due to inadequate resource management. The general objective of the study was to examine the effect of project resource management on performance of water supply projects in Rwanda, specifically, Financial Resource Management, Human Resource Management, and Material Resource Management. The study used Resource-Based View (RBV) Theory and Goal setting theory. The target population was 273 people who were members of the Water for All Rwanda Project. To find the right amount of data to collect, the researcher used Slovin's formula to get a sample size of 162 respondents. The sampling technique that was used in the research was stratified sampling to put respondents into their appropriate groups. Then the researcher proportionately selected respondents using simple random sampling. The study made use of a questionnaire, interviews, and documentation research to collect data. The study adopted descriptive and correlational research design. The researcher did a pilot study with 10% of the total sample size equal to 16 respondents. Content Validity Index was 0.8 and the overall reliability coefficient was 0.814 for all items. Data analysis involved descriptive and inferential statistics of correlation and regression analyzed by Statistical Package for the Social Sciences (SPSS) version 25. The findings for three hypotheses were at ?=.05 that: There is no significant effect of financial resource management, human resource management and material resource management on performance of water supply projects in Rwanda were rejected since P=0.000<0.05, confirming that they have a significant positive influence on performance of water supply projects. The study revealed that there is significant effect of financial resource, human resource, and material resource management on performance of water supply projects in the Water for All Rwanda Project. It is recommended that the Water for All Rwanda Project focus on enhancing financial resource management by improving funding timeliness and strengthening financial monitoring mechanisms to ensure efficient resource allocation. Future research needs to examine the effects of community involvement on project implementation of water supply projects.
Keywords: {'name': 'Project resource management, Performance of water supply projects, financial resource management, human resource management, material resource management'}
Authors & affiliations
Ishimwe Hertier Sauveur
Affiliation not supplied
Amolo Elvis Juma Amolo
Affiliation not supplied
Deposited references
Supplied references, not a list of publications citing this article.
DOI: 10.51867/ajernet.5.2.35
DOI: 10.3390/su12219187
Armstrong, M., & Taylor, S. (2023). A handbook of human resource management practice: A guide to the theory and practice of people management. Kogan Page Publishers.
Bikorimana, G., Maniraho, L., & Umuziranenge, G. (2024). Natural Resource Management and Poverty Reduction in Rwanda. ASC-TUFS Working Papers, 4, 171-188.
DOI: 10.4324/9781003344544-5
DOI: 10.3390/su12104204
DOI: 10.1080/0965254X.2022.2160486
DOI: 10.1108/IJCHM-04-2020-0300
DOI: 10.1002/csr.2493
DOI: 10.3390/su14052872