CiteNScope — Scholarly Index & Analytics
Discover / IJFBSPUBLICATION RECORD

Risk Management Strategies in Micro Hydropower Projects

Nsengiyumva Nituze Edwidge · Amolo Elvis Juma Amolo

International Journal of Finance & Banking Studies · 2025 · Vol. 14 / Issue 1 · 236-245

Research reach

Publication metrics

External links open provider records or DOI searches. Provider counts are not combined. Mendeley readership measures saves, not citations.

Dimensions

Live provider badge. If unavailable, use the Dimensions link above.

CROSSREF CITATIONS0

Observed 21 Oct 2026, 00:21 UTC

OpenAlex · Citations0Cached provider observation

Observed 22 Oct 2026 01:18 UTC

Mendeley · Readers1Cached provider observation

Observed 22 Oct 2026 01:18 UTC

OpenAlex and Mendeley observations refresh on article visits, at most once per 24 hours. Unavailable data is not zero. Google Scholar opens a DOI search.

OpenAlex / Citation year

Annual citations to this article

View provider totals ↑

Citations received by this article, grouped by the year of the citing work. Crossref and OpenAlex lifetime totals remain separate in Publication metrics.

2017–2026 Annual history last updated:

Citations received

OpenAlex · year of the citing work

OpenAlex

Hover over a year or focus the chart and use arrow keys to inspect values.

2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.

View data & coverage

2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Years beyond a saved observation’s window remain unknown (—). Older citations are excluded, so this chart’s sum may differ from the OpenAlex lifetime total. The date above belongs to this annual history; an unsuccessful refresh keeps the previous observation.

Overview

Abstract

While Micro Hydropower Plants in Rwanda offer sustainable energy solutions, their success is often hindered by insufficient risk management strategies, leading to challenges such as delays, cost overruns, and operational inefficiencies. This study aimed to assess the influence of risk management strategies on performance of hydroelectric energy projects in Rwanda: A case of Micro Hydropower Plants. The study's specific objectives include: To determine the influence of risk identification, risk analysis, risk response and, risk review and control on performance of hydroelectric energy projects in Rwanda. The study is grounded on Theory of Constraints (TOC), Resource-Based View (RBV) and Goal-Setting Theory. Utilizing descriptive and correlational research designs, both quantitative and qualitative data were collected through questionnaires and semi-structured interviews; from a census of 105 participants, selected using a combination of stratified and purposing sampling. A pilot test was conducted with 11 respondents representing 10% of the sample size to determine the instrument's ability to produce consistent results over time. The validity was tested using Content Validity which resulted a content validity index of 0.8 by expert evaluation while the reliability of the research instrument (questionnaire) was also assessed using Cronbach’s Alpha achieved 0.74. Data was analyzed using descriptive and inferential statistics, including correlation and regression analysis. The findings for four hypotheses were tested at ?=.05 level of significance and the results were: Risk Identification; Risk Analysis; Risk Response and; Risk Review and Control had no significant influence on performance of hydroelectric energy projects were rejected since P=0.000<0.05, indicating that all the risk management strategies significantly contribute to enhancing project performance. The study concludes that while Rwanda's hydroelectric projects are generally successful, their sustainability can be improved through better risk management practices, including enhanced risk identification, response strategies, and ongoing monitoring. Further research should focus on evaluating the long-term effectiveness of risk mitigation strategies in hydroelectric projects, tracking outcomes across multiple projects to identify the most effective strategies for ensuring sustainability and maximizing return on investment.   

Keywords: {'name': 'risk management strategies, Risk Identification, Risk Analysis, Risk Response, Risk Review and Control, performance of hydroelectric energy projects'}

Authors & affiliations

Nsengiyumva Nituze Edwidge
Affiliation not supplied

Amolo Elvis Juma Amolo
Affiliation not supplied

Deposited references

Supplied references, not a list of publications citing this article.

No reference list supplied.