Project Resource Management and Performance in Housing Construction Projects
Ndahiro Richard · Amolo Elvis Juma Amolo
International Journal of Finance & Banking Studies · 2025 · Vol. 14 / Issue 2 · 118-129
Publication metrics
External links open provider records or DOI searches. Provider counts are not combined. Mendeley readership measures saves, not citations.
Dimensions
Live provider badge. If unavailable, use the Dimensions link above.
Observed 21 Oct 2026, 00:21 UTC
Observed 21 Oct 2026 00:22 UTC
OpenAlex and Mendeley observations refresh on article visits, at most once per 24 hours. Unavailable data is not zero. Google Scholar opens a DOI search.
Citations received by this article, grouped by the year of the citing work. Crossref and OpenAlex lifetime totals remain separate in Publication metrics.
2017–2026 Annual history last updated:
Citations received
OpenAlex · year of the citing work
Hover over a year or focus the chart and use arrow keys to inspect values.
2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.
View data & coverage
2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Years beyond a saved observation’s window remain unknown (—). Older citations are excluded, so this chart’s sum may differ from the OpenAlex lifetime total. The date above belongs to this annual history; an unsuccessful refresh keeps the previous observation.
Abstract
The study investigates the effect of project resource management—including human, financial, material, and technological resources—on the performance of housing construction projects, with a case study of the One and Only Resort’s Staff Accommodation Project in Musanze District, Rwanda. Effective resource management is essential for optimizing project outcomes, yet Rwanda’s construction sector faces challenges such as workforce skill gaps and motivation issues that hinder efficiency. Grounded in the Resource-Based View Theory, Human Capital Theory, and Theory of Change, the research employed a descriptive and correlational design, targeting 308 stakeholders, including project managers, skilled laborers, administrative staff, and consultants. A sample of 174 participants was selected through stratified sampling, with data collected via questionnaires, interviews, and documentation. The instruments demonstrated strong validity (0.892) and reliability (0.803). Using SPSS version 28 for correlation and regression analysis at a 0.05 significance level, the study rejected all four null hypotheses (p = 0.000), confirming that human, financial, material, and technology resource management significantly enhance project performance. The findings underscore the importance of strategic resource allocation in improving construction efficiency and project success. The study recommends that project managers continuously refine resource management strategies to optimize outcomes and suggests future research on the role of risk management in housing construction projects. This research provides valuable insights into resource optimization in Rwanda’s construction sector, offering practical guidance for enhancing housing project performance through effective resource management.
Keywords: {'name': 'Project Resource Management, Human Resource Management, Financial Resource Management, Material Resource Management, Technology Resource Management, Performance of Housing Construction Projects'}
Authors & affiliations
Ndahiro Richard
Affiliation not supplied
Amolo Elvis Juma Amolo
Affiliation not supplied
Deposited references
Supplied references, not a list of publications citing this article.
No reference list supplied.