Publication activity
Articles grouped by publication year
Hover over a year or focus the chart and use arrow keys to inspect values.
2026 is year to date. 0 undated publications excluded.
Research across participating journals · All insights follow your collection filters.
Publication activity alongside incoming citations.
Articles grouped by publication year
Hover over a year or focus the chart and use arrow keys to inspect values.
2026 is year to date. 0 undated publications excluded.
OpenAlex · year of the citing work
Hover over a year or focus the chart and use arrow keys to inspect values.
2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.
Leading affiliations and themes in this collection.
Full distributions & methodology ↓Independent sources. Clear time scales.
Crossref and OpenAlex · separate totals for the same publication cohorts
Hover over a year or focus the chart and use arrow keys to inspect values.
Latest lifetime totals, grouped by the cited article’s year. These are not citations received in that year.
OpenAlex · incoming citation links grouped by citing-work year
Hover over a year or focus the chart and use arrow keys to inspect values.
2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.
Select journals to compare the same collection filters. Source totals stay separate. These measures describe research activity, not journal quality.
Articles by publication year
Latest lifetime totals · grouped by publication year
Latest lifetime totals · grouped by publication year
By year of the citing work · 2017–2026
2026 is year to date. Crossref and OpenAlex lifetime charts share a citation scale. Unknown observations appear as gaps; known zero stays zero. Annual receipts use available OpenAlex histories and may not sum to lifetime totals. 0 undated publications excluded from publication-year charts.
Crossref citation coverage: 3 / 3 publications (100.0%). Latest observation: 21 Oct 2026, 00:21 UTC. Means and percentages use records with known counts.
DOI-matched OpenAlex observations for the same selected publications. These counts are separate from Crossref and are never added together.
Observation range: 22 Oct 2026 02:10 UTC — 23 Oct 2026 15:09 UTC. Missing matches are not zero citations. Previous observations may remain if a refresh fails or a DOI no longer matches.
OpenAlex affiliations and primary-topic classification. Each publication counts once per institution or country; multi-affiliated publications appear in multiple groups, so percentages can sum above 100%. Countries describe author affiliations, not nationality. Topics use one primary topic per publication.
3 / 3 with data · 0 missing or unmatched. Percentages use all 3 selected publications.
3 / 3 with data · 0 missing or unmatched. Percentages use all 3 selected publications.
3 / 3 with data · 0 missing or unmatched. Percentages use all 3 selected publications.
Citations are the latest recorded totals for articles published in each year, not citations received during that year. Crossref and OpenAlex remain separate and share the same citation scale. 2026 is incomplete; newer articles have had less time to receive citations.
0 undated publications excluded. Unknown citation counts are shown as —, never as zero. Partial coverage can understate totals; expand each table for known / total records.
| Publication year | Journal / scope | Publications | Publications | Crossref known | OpenAlex known |
|---|---|---|---|---|---|
| 2025 | All selected publications | 3 | 3 | 3/3 | 3/3 |
| Publication year | Journal / scope | Crossref citations | Publications | Crossref known | OpenAlex known |
|---|---|---|---|---|---|
| 2025 | All selected publications | 1 | 3 | 3/3 | 3/3 |
| Publication year | Journal / scope | OpenAlex citations | Publications | Crossref known | OpenAlex known |
|---|---|---|---|---|---|
| 2025 | All selected publications | 1 | 3 | 3/3 | 3/3 |
Incoming citations to the selected publications, grouped by the year of the citing work. This is separate from lifetime citation totals grouped by the cited article’s publication year.
The publication filters above define which articles receive the citations. The citation-year range below only controls this chart and the incoming-citation comparison. Removing publication-year filters includes older articles’ incoming citations too.
Annual history available for 3 / 3 selected publications. Supported display window: 2017–2026; 2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Missing histories and years beyond a saved observation’s window remain unknown (—); partial coverage can understate totals.
Annual-history observations (UTC): 2026-10-22T02:10:58.995000+00:00 — 2026-10-23T15:09:09.398807+00:00. Older observations may be retained after failed or incomplete refreshes.
| Citation year | Journal / scope | OpenAlex · Citations received by year | Publications | Annual history known |
|---|---|---|---|---|
| 2017 | All selected publications | 0 | 3 | 3/3 |
| 2018 | All selected publications | 0 | 3 | 3/3 |
| 2019 | All selected publications | 0 | 3 | 3/3 |
| 2020 | All selected publications | 0 | 3 | 3/3 |
| 2021 | All selected publications | 0 | 3 | 3/3 |
| 2022 | All selected publications | 0 | 3 | 3/3 |
| 2023 | All selected publications | 0 | 3 | 3/3 |
| 2024 | All selected publications | 0 | 3 | 3/3 |
| 2025 | All selected publications | 0 | 3 | 3/3 |
| 2026 | All selected publications | 1 | 3 | 3/3 |
Counts represent citation links, not unique citing papers across a journal: one paper citing two selected articles contributes two links. Older citations outside this window are excluded, so annual sums need not equal lifetime totals. OpenAlex methodology ↗
Publications by publication year. 2026 is an incomplete year.
| Period | Publications |
|---|---|
| 2025 | 3 |
Latest Crossref totals for the selected publications; not citations received in the selected years.
Unknown counts are excluded from the mean, median and cited-publication rate.
Same filters, source and counting rules across journals. Descriptive statistics, not a quality ranking.
| Journal / publisher | Publications | Crossref citations | OpenAlex citations | OpenAlex coverage | Crossref mean | Crossref median | Crossref cited %* | Crossref coverage |
|---|---|---|---|---|---|---|---|---|
| International Journal of Finance & Banking Studies SSBFNET | 3 | 1 | 1 | 3/3 | 0.33 | 0 | 33.3 | 3/3 · 100.0% |
* Percentage among publications with a known citation count.
Effective communication is critical for project success, but challenges such as unclear goals, inadequate audience identification, poorly designed communication channels, and insufficient documentation have hindered project outcomes. Drawing from global and regional perspectives, this study emphasizes the role of communication in enhancing transparency, stakeholder alignment, and project sustainability. This study examines the influence of communication strategies of goals, audience identification, channels and documentation on performance of water supply projects in Musanze District, Rwanda. This study uses the theories of Communication and Diffusion of Innovations Theory. The study employs a descriptive survey and correlational research design with a target population of 416 respondents, resulting in a sample size of 204 respondents. Data was collected through questionnaires, interviews, and documentation review. A pilot study was conducted with 20 respondents and the instruments' validity was confirmed with a Content Validity Index (CVI) of 0.76, while reliability was confirmed with a Cronbach’s alpha of 0.79. Findings for four hypotheses reveal that; Communication Goals (P=0.000 < 0.05); Audience Identification (P=0.000 < 0.05); communication channels (P=0.000 < 0.05) and; Communication Documentation (P=0.000 < 0.05) does not significantly influence project performance were rejected, this confirm that Communication Documentation has a significant positive influence on project performance. Means that communication goals, audience identification, communication channels, and documentation all significantly contribute to the success of water supply projects. The study identifies key areas for improvement, including clearer communication goals, more inclusive stakeholder engagement, better accessibility of communication channels, and more systematic documentation practices. Based on these findings, recommendations are made for better budget planning, stakeholder engagement, and enhanced communication practices to improve the sustainability and success of future water supply projects in Musanze District and similar contexts. Further research should explore sustainable maintenance models, the impact of capacity-building programs, and the role of communication in budget management to improve stakeholder collaboration and long-term project viability.
The study investigates the effect of project resource management—including human, financial, material, and technological resources—on the performance of housing construction projects, with a case study of the One and Only Resort’s Staff Accommodation Project in Musanze District, Rwanda. Effective resource management is essential for optimizing project outcomes, yet Rwanda’s construction sector faces challenges such as workforce skill gaps and motivation issues that hinder efficiency. Grounded in the Resource-Based View Theory, Human Capital Theory, and Theory of Change, the research employed a descriptive and correlational design, targeting 308 stakeholders, including project managers, skilled laborers, administrative staff, and consultants. A sample of 174 participants was selected through stratified sampling, with data collected via questionnaires, interviews, and documentation. The instruments demonstrated strong validity (0.892) and reliability (0.803). Using SPSS version 28 for correlation and regression analysis at a 0.05 significance level, the study rejected all four null hypotheses (p = 0.000), confirming that human, financial, material, and technology resource management significantly enhance project performance. The findings underscore the importance of strategic resource allocation in improving construction efficiency and project success. The study recommends that project managers continuously refine resource management strategies to optimize outcomes and suggests future research on the role of risk management in housing construction projects. This research provides valuable insights into resource optimization in Rwanda’s construction sector, offering practical guidance for enhancing housing project performance through effective resource management.
S Stakeholder engagement has been indicated as great driver for successful electrification projects in many countries, including settings similar to Rwanda. However, little is known about its influence on electrification projects in Rwanda. The purpose of this study was to evaluate how different strategies of stakeholder engagement influence performance of electrification project Musanze District, Rwanda, with a focus on RUEAP. Specific focus was on collaboration strategy, involvement strategy, empowerment strategy and consultation strategy. Stakeholder theory and Goal Setting Theory informed the study. The study used descriptive survey and correlational research designs. A structured questionnaire and interview guide were used to collect quantitative data from 452 participants who were selected using Stratified, random and purposive sampling from a target population of 4691. The questionnaire was piloted with 47 participants, representing 10% of the sample size. The Validity of instrument was done and the coefficient of 0.8 was obtained. Reliability was established using Cronbach’s alpha test, and a Cronbach’s alpha coefficient of 0.899 was found. Descriptive statistics and inferential statistics of Correlation and Regression were done at a significance level of 0.05 using SPSS version 28 while thematic content analysis of qualitative data was done on qualitative data. The findings for four hypotheses were tested at ?=.05 level of significance and the results were: stakeholder collaboration (P=0.011<0.05); stakeholder involvement (P=0.015<0.05); stakeholder empowerment (P=0.000<0.05) and; stakeholder consultation (P=0.007<0.05) does not significantly influence performance of electrification projects were rejected, confirming that they all had a significant influence on project performance. The study concludes that Stakeholders’ engagement in electrification project in Musanze have significantly influenced the electrification project performance. It is recommended that RUEAP project should continue to prioritize stakeholder engagement during the implementation of the project, but greater emphasis must be considered to begin engagement during the planning stage to ensure that the project aligns with public needs and expectation. Future research should involve a nationally representative sample of stakeholders would paint a picture of how engagement influence performance that is generalizable to other settings across Rwanda.
The study investigates the effect of project resource management—including human, financial, material, and technological resources—on the performance of housing construction projects, with a case study of the One and Only Resort’s Staff Accommodation Project in Musanze District, Rwanda. Effective resource management is essential for optimizing project outcomes, yet Rwanda’s construction sector faces challenges such as workforce skill gaps and motivation issues that hinder efficiency. Grounded in the Resource-Based View Theory, Human Capital Theory, and Theory of Change, the research employed a descriptive and correlational design, targeting 308 stakeholders, including project managers, skilled laborers, administrative staff, and consultants. A sample of 174 participants was selected through stratified sampling, with data collected via questionnaires, interviews, and documentation. The instruments demonstrated strong validity (0.892) and reliability (0.803). Using SPSS version 28 for correlation and regression analysis at a 0.05 significance level, the study rejected all four null hypotheses (p = 0.000), confirming that human, financial, material, and technology resource management significantly enhance project performance. The findings underscore the importance of strategic resource allocation in improving construction efficiency and project success. The study recommends that project managers continuously refine resource management strategies to optimize outcomes and suggests future research on the role of risk management in housing construction projects. This research provides valuable insights into resource optimization in Rwanda’s construction sector, offering practical guidance for enhancing housing project performance through effective resource management.
Effective communication is critical for project success, but challenges such as unclear goals, inadequate audience identification, poorly designed communication channels, and insufficient documentation have hindered project outcomes. Drawing from global and regional perspectives, this study emphasizes the role of communication in enhancing transparency, stakeholder alignment, and project sustainability. This study examines the influence of communication strategies of goals, audience identification, channels and documentation on performance of water supply projects in Musanze District, Rwanda. This study uses the theories of Communication and Diffusion of Innovations Theory. The study employs a descriptive survey and correlational research design with a target population of 416 respondents, resulting in a sample size of 204 respondents. Data was collected through questionnaires, interviews, and documentation review. A pilot study was conducted with 20 respondents and the instruments' validity was confirmed with a Content Validity Index (CVI) of 0.76, while reliability was confirmed with a Cronbach’s alpha of 0.79. Findings for four hypotheses reveal that; Communication Goals (P=0.000 < 0.05); Audience Identification (P=0.000 < 0.05); communication channels (P=0.000 < 0.05) and; Communication Documentation (P=0.000 < 0.05) does not significantly influence project performance were rejected, this confirm that Communication Documentation has a significant positive influence on project performance. Means that communication goals, audience identification, communication channels, and documentation all significantly contribute to the success of water supply projects. The study identifies key areas for improvement, including clearer communication goals, more inclusive stakeholder engagement, better accessibility of communication channels, and more systematic documentation practices. Based on these findings, recommendations are made for better budget planning, stakeholder engagement, and enhanced communication practices to improve the sustainability and success of future water supply projects in Musanze District and similar contexts. Further research should explore sustainable maintenance models, the impact of capacity-building programs, and the role of communication in budget management to improve stakeholder collaboration and long-term project viability.
S Stakeholder engagement has been indicated as great driver for successful electrification projects in many countries, including settings similar to Rwanda. However, little is known about its influence on electrification projects in Rwanda. The purpose of this study was to evaluate how different strategies of stakeholder engagement influence performance of electrification project Musanze District, Rwanda, with a focus on RUEAP. Specific focus was on collaboration strategy, involvement strategy, empowerment strategy and consultation strategy. Stakeholder theory and Goal Setting Theory informed the study. The study used descriptive survey and correlational research designs. A structured questionnaire and interview guide were used to collect quantitative data from 452 participants who were selected using Stratified, random and purposive sampling from a target population of 4691. The questionnaire was piloted with 47 participants, representing 10% of the sample size. The Validity of instrument was done and the coefficient of 0.8 was obtained. Reliability was established using Cronbach’s alpha test, and a Cronbach’s alpha coefficient of 0.899 was found. Descriptive statistics and inferential statistics of Correlation and Regression were done at a significance level of 0.05 using SPSS version 28 while thematic content analysis of qualitative data was done on qualitative data. The findings for four hypotheses were tested at ?=.05 level of significance and the results were: stakeholder collaboration (P=0.011<0.05); stakeholder involvement (P=0.015<0.05); stakeholder empowerment (P=0.000<0.05) and; stakeholder consultation (P=0.007<0.05) does not significantly influence performance of electrification projects were rejected, confirming that they all had a significant influence on project performance. The study concludes that Stakeholders’ engagement in electrification project in Musanze have significantly influenced the electrification project performance. It is recommended that RUEAP project should continue to prioritize stakeholder engagement during the implementation of the project, but greater emphasis must be considered to begin engagement during the planning stage to ensure that the project aligns with public needs and expectation. Future research should involve a nationally representative sample of stakeholders would paint a picture of how engagement influence performance that is generalizable to other settings across Rwanda.
Source coverage refers to this result set; a publication may occur in several sources. Sync times refer to contributing journals.
Missing abstracts: 0 · Missing authors: 0 · Missing publication dates: 0 · Dates without day precision: 0
| Source | Most recent successful journal sync | Latest attempt |
|---|---|---|
| crossref | 21 Oct 2026 00:21 UTC · ijfbs | complete · ijfbs · 21 Oct 2026 00:21 UTC |
| ojs-rest | 21 Oct 2026 00:21 UTC · ijfbs | complete · ijfbs · 21 Oct 2026 00:14 UTC |
| oai-pmh | 20 Oct 2026 19:56 UTC · ijfbs | complete · ijfbs · 20 Oct 2026 19:55 UTC |
| openalex-enrichment | 21 Oct 2026 00:22 UTC · ijfbs | complete · ijfbs · 21 Oct 2026 00:21 UTC |