Publication activity
Articles grouped by publication year
Hover over a year or focus the chart and use arrow keys to inspect values.
2026 is year to date. 0 undated publications excluded.
Research across participating journals · All insights follow your collection filters.
Publication activity alongside incoming citations.
Articles grouped by publication year
Hover over a year or focus the chart and use arrow keys to inspect values.
2026 is year to date. 0 undated publications excluded.
OpenAlex · year of the citing work
Hover over a year or focus the chart and use arrow keys to inspect values.
2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.
Leading affiliations and themes in this collection.
Full distributions & methodology ↓Independent sources. Clear time scales.
Crossref and OpenAlex · separate totals for the same publication cohorts
Hover over a year or focus the chart and use arrow keys to inspect values.
Latest lifetime totals, grouped by the cited article’s year. These are not citations received in that year.
OpenAlex · incoming citation links grouped by citing-work year
Hover over a year or focus the chart and use arrow keys to inspect values.
2017–2026 annual-history window. 2026 is year to date. Unknown years have gaps.
Select journals to compare the same collection filters. Source totals stay separate. These measures describe research activity, not journal quality.
Articles by publication year
Latest lifetime totals · grouped by publication year
Latest lifetime totals · grouped by publication year
By year of the citing work · 2017–2026
2026 is year to date. Crossref and OpenAlex lifetime charts share a citation scale. Unknown observations appear as gaps; known zero stays zero. Annual receipts use available OpenAlex histories and may not sum to lifetime totals. 0 undated publications excluded from publication-year charts.
Crossref citation coverage: 5 / 5 publications (100.0%). Latest observation: 21 Oct 2026, 07:22 UTC. Means and percentages use records with known counts.
DOI-matched OpenAlex observations for the same selected publications. These counts are separate from Crossref and are never added together.
Observation range: 21 Oct 2026 00:49 UTC — 21 Oct 2026 07:22 UTC. Missing matches are not zero citations. Previous observations may remain if a refresh fails or a DOI no longer matches.
OpenAlex affiliations and primary-topic classification. Each publication counts once per institution or country; multi-affiliated publications appear in multiple groups, so percentages can sum above 100%. Countries describe author affiliations, not nationality. Topics use one primary topic per publication.
5 / 5 with data · 0 missing or unmatched. Percentages use all 5 selected publications.
5 / 5 with data · 0 missing or unmatched. Percentages use all 5 selected publications.
5 / 5 with data · 0 missing or unmatched. Percentages use all 5 selected publications.
Citations are the latest recorded totals for articles published in each year, not citations received during that year. Crossref and OpenAlex remain separate and share the same citation scale. 2026 is incomplete; newer articles have had less time to receive citations.
0 undated publications excluded. Unknown citation counts are shown as —, never as zero. Partial coverage can understate totals; expand each table for known / total records.
| Publication year | Journal / scope | Publications | Publications | Crossref known | OpenAlex known |
|---|---|---|---|---|---|
| 2020 | All selected publications | 1 | 1 | 1/1 | 1/1 |
| 2021 | All selected publications | 0 | 0 | 0/0 | 0/0 |
| 2022 | All selected publications | 0 | 0 | 0/0 | 0/0 |
| 2023 | All selected publications | 3 | 3 | 3/3 | 3/3 |
| 2024 | All selected publications | 1 | 1 | 1/1 | 1/1 |
| Publication year | Journal / scope | Crossref citations | Publications | Crossref known | OpenAlex known |
|---|---|---|---|---|---|
| 2020 | All selected publications | 5 | 1 | 1/1 | 1/1 |
| 2021 | All selected publications | — | 0 | 0/0 | 0/0 |
| 2022 | All selected publications | — | 0 | 0/0 | 0/0 |
| 2023 | All selected publications | 9 | 3 | 3/3 | 3/3 |
| 2024 | All selected publications | 3 | 1 | 1/1 | 1/1 |
| Publication year | Journal / scope | OpenAlex citations | Publications | Crossref known | OpenAlex known |
|---|---|---|---|---|---|
| 2020 | All selected publications | 7 | 1 | 1/1 | 1/1 |
| 2021 | All selected publications | — | 0 | 0/0 | 0/0 |
| 2022 | All selected publications | — | 0 | 0/0 | 0/0 |
| 2023 | All selected publications | 13 | 3 | 3/3 | 3/3 |
| 2024 | All selected publications | 2 | 1 | 1/1 | 1/1 |
Incoming citations to the selected publications, grouped by the year of the citing work. This is separate from lifetime citation totals grouped by the cited article’s publication year.
The publication filters above define which articles receive the citations. The citation-year range below only controls this chart and the incoming-citation comparison. Removing publication-year filters includes older articles’ incoming citations too.
Annual history available for 5 / 5 selected publications. Supported display window: 2017–2026; 2026 is incomplete. Within a successfully fetched ten-year window, omitted years mean zero. Missing histories and years beyond a saved observation’s window remain unknown (—); partial coverage can understate totals.
Annual-history observations (UTC): 2026-10-21T00:49:33.126667+00:00 — 2026-10-21T07:22:54.145103+00:00. Older observations may be retained after failed or incomplete refreshes.
| Citation year | Journal / scope | OpenAlex · Citations received by year | Publications | Annual history known |
|---|---|---|---|---|
| 2017 | All selected publications | 0 | 5 | 5/5 |
| 2018 | All selected publications | 0 | 5 | 5/5 |
| 2019 | All selected publications | 0 | 5 | 5/5 |
| 2020 | All selected publications | 0 | 5 | 5/5 |
| 2021 | All selected publications | 0 | 5 | 5/5 |
| 2022 | All selected publications | 0 | 5 | 5/5 |
| 2023 | All selected publications | 5 | 5 | 5/5 |
| 2024 | All selected publications | 7 | 5 | 5/5 |
| 2025 | All selected publications | 6 | 5 | 5/5 |
| 2026 | All selected publications | 4 | 5 | 5/5 |
Counts represent citation links, not unique citing papers across a journal: one paper citing two selected articles contributes two links. Older citations outside this window are excluded, so annual sums need not equal lifetime totals. OpenAlex methodology ↗
Publications by publication year. 2026 is an incomplete year.
| Period | Publications |
|---|---|
| 2020 | 1 |
| 2023 | 3 |
| 2024 | 1 |
Latest Crossref totals for the selected publications; not citations received in the selected years.
Unknown counts are excluded from the mean, median and cited-publication rate.
Same filters, source and counting rules across journals. Descriptive statistics, not a quality ranking.
| Journal / publisher | Publications | Crossref citations | OpenAlex citations | OpenAlex coverage | Crossref mean | Crossref median | Crossref cited %* | Crossref coverage |
|---|---|---|---|---|---|---|---|---|
| International Journal of Research in Business and Social Science SSBFNET | 5 | 17 | 22 | 5/5 | 3.4 | 3 | 100.0 | 5/5 · 100.0% |
* Percentage among publications with a known citation count.
Over the last decade, developing countries have been promoting public-private partnerships (PPPs) as an alternative approach to developing infrastructure and services. This is done by utilising the efficiency and innovation of the private sector and enabling access to private-sector finance through public-private partnerships (PPP). Importantly, PPPs ensure more value for money than traditional financing options and highway and transportation infrastructure revenue sources. The study is qualitative, relied on the extensive review of written documents. In light of this, the study explores the utility and efficacy of PPPs in road tolling initiatives and highway infrastructure investment in Zimbabwe. Emphasis was placed on the PPP arrangement between the Zimbabwe National Roads Administration (ZINARA) and a South African company- Group Five, which saw road tolls being erected and operationalised to fund Zimbabwean highway infrastructure. The paper established that despite this PPP arrangement being a success, as seen by the faster completion of the trunk roads, lower project lifecycle costs, better risk allocation, faster implementation of public works and services, improved service quality and additional revenue streams a myriad of operational and administrative challenges equally dogged it. To this effect, the paper, therefore, recommends some strategies to strengthen and enhance the adoption, operationalization, and management of PPPs for road tolling and highway infrastructure investments in developing countries.
In spite of the rise in the global adoption of public private partnerships, developing countries have failed to attract private investments in equally measure as their developed partners. This has impacted on infrastructural financing in developing countries. The current study sought to establish how market risks influence the performance of public private partnership renewable energy projects. The study adopted a pragmatic paradigm and employed a mixed methods approach, correlational and descriptive survey design. Quantitative data was collected by use of a self-administered questionnaire and while an interview guide was used to collect qualitative data after piloting and reliability established. A sample size of 263 respondents was drawn from a target population of 769 using the Yamane formula. For descriptive statistics the study used the mean and standard deviation. For inferential statistics the study used Pearson’s Product Moment Correlation (r) and Multiple Regression while the F-tests were used in hypothesis testing. The study established a significant influence of market risks on the performance of public private partnerships renewable energy projects F (1,204) =104.689, P=0.000? 0.05. H0 was consequently rejected. Based on this finding the study recommends hedging measures to promote public private partnerships
Governments of Sub Saharan African (SSA) countries have struggled to successfully invest in capital intensive projects. As such, public private partnerships play a key role in redefining the role of Government in the context of infrastructure projects, by focusing on supervision and regulation and moving away from direct ownership and management. Sub Saharan African countries have seen such inclusive partnerships yielding some numerous benefits in different sectors. However, despite the salubrious benefits that PPPs have brought in different projects, PPPs in SSA countries are still dogged by a myriad of administrative, technical, financial and legal challenges. These corporate governance related challenges have made it difficult for these SSA governments to glean the full benefits of PPPs. The study is informed by the qualitative methodology with an extensive review of literature. Data was gathered from purposively selected written documents and these documents were analysed using thematic and content analysis techniques. The study established that there are some corporate governance deficiencies in most PPP projects in the SSA countries. Additionally, most of these public projects in the SSA lack adequate good corporate governance attention that is given to the PPP procedures and processes involved. The study therefore recommends that there is need for the full adoption of good corporate governance systems, practices, processes and procedures in the PPPs designing, financing, implementation and operationalisation in SSA.
Pennsylvania's aging transportation infrastructure has long been a cause for concern, with bridges, highways, and other vital components approaching the end of their serviceable lifespans. The state's infrastructure, one of the nation's oldest, is in dire need of repair and replacement, particularly in the case of bridges, many of which are over 50 years old and in poor condition. However, the financial investment required for this task is substantial, posing challenges within the state's budget constraints. To address this infrastructure crisis, an amendment to Pennsylvania's existing legislation, Act 88, is proposed. This amendment would permit local governments to engage in Public-Private Transportation Partnerships (P3s), leveraging private sector financial resources and expertise. Such local government Transportation P3s have the potential to alleviate the state's infrastructure and financial woes. Currently, Act 88 prohibits municipal governments from participating in these partnerships, hindering the Commonwealth's ability to secure private funding and expertise when public resources are limited. This study aims to address the structural deficiencies in Pennsylvania's transportation infrastructure and its $2.2 billion financial deficit, which hampers repair and improvement efforts. The study employs a descriptive, multi-case analysis to investigate how an amendment to Act 88 could enable local municipalities to engage in P3 transportation projects. These partnerships could provide solutions to budgetary and funding challenges, particularly in the context of locally owned bridge repair and replacement projects. The selected cases are evaluated against various performance criteria, such as value, pricing, budgeting, public accountability, regulatory control, and capacity, offering a comprehensive assessment of the potential benefits of local government participation in P3 transportation projects.
Clean, sufficient water is becoming increasingly scarce worldwide, particularly in African metropolitan areas. Today's urban water systems face several challenges, including, among other things, migration from rural to urban areas, climate change, natural disasters, and a lack of institutional capacity, expertise, and financial and human resources. As a result, governments across Africa are struggling to meet constitutional requirements to provide clean and sufficient water and sanitation. This article aims to investigate the value of public-private partnerships (PPPs) in improving Africa's urban water infrastructure. The research in this article was qualitative. Data were gathered through a literature review, and conceptual analysis was used. The findings show that a variety of factors are at work.
Governments of Sub Saharan African (SSA) countries have struggled to successfully invest in capital intensive projects. As such, public private partnerships play a key role in redefining the role of Government in the context of infrastructure projects, by focusing on supervision and regulation and moving away from direct ownership and management. Sub Saharan African countries have seen such inclusive partnerships yielding some numerous benefits in different sectors. However, despite the salubrious benefits that PPPs have brought in different projects, PPPs in SSA countries are still dogged by a myriad of administrative, technical, financial and legal challenges. These corporate governance related challenges have made it difficult for these SSA governments to glean the full benefits of PPPs. The study is informed by the qualitative methodology with an extensive review of literature. Data was gathered from purposively selected written documents and these documents were analysed using thematic and content analysis techniques. The study established that there are some corporate governance deficiencies in most PPP projects in the SSA countries. Additionally, most of these public projects in the SSA lack adequate good corporate governance attention that is given to the PPP procedures and processes involved. The study therefore recommends that there is need for the full adoption of good corporate governance systems, practices, processes and procedures in the PPPs designing, financing, implementation and operationalisation in SSA.
Pennsylvania's aging transportation infrastructure has long been a cause for concern, with bridges, highways, and other vital components approaching the end of their serviceable lifespans. The state's infrastructure, one of the nation's oldest, is in dire need of repair and replacement, particularly in the case of bridges, many of which are over 50 years old and in poor condition. However, the financial investment required for this task is substantial, posing challenges within the state's budget constraints. To address this infrastructure crisis, an amendment to Pennsylvania's existing legislation, Act 88, is proposed. This amendment would permit local governments to engage in Public-Private Transportation Partnerships (P3s), leveraging private sector financial resources and expertise. Such local government Transportation P3s have the potential to alleviate the state's infrastructure and financial woes. Currently, Act 88 prohibits municipal governments from participating in these partnerships, hindering the Commonwealth's ability to secure private funding and expertise when public resources are limited. This study aims to address the structural deficiencies in Pennsylvania's transportation infrastructure and its $2.2 billion financial deficit, which hampers repair and improvement efforts. The study employs a descriptive, multi-case analysis to investigate how an amendment to Act 88 could enable local municipalities to engage in P3 transportation projects. These partnerships could provide solutions to budgetary and funding challenges, particularly in the context of locally owned bridge repair and replacement projects. The selected cases are evaluated against various performance criteria, such as value, pricing, budgeting, public accountability, regulatory control, and capacity, offering a comprehensive assessment of the potential benefits of local government participation in P3 transportation projects.
Over the last decade, developing countries have been promoting public-private partnerships (PPPs) as an alternative approach to developing infrastructure and services. This is done by utilising the efficiency and innovation of the private sector and enabling access to private-sector finance through public-private partnerships (PPP). Importantly, PPPs ensure more value for money than traditional financing options and highway and transportation infrastructure revenue sources. The study is qualitative, relied on the extensive review of written documents. In light of this, the study explores the utility and efficacy of PPPs in road tolling initiatives and highway infrastructure investment in Zimbabwe. Emphasis was placed on the PPP arrangement between the Zimbabwe National Roads Administration (ZINARA) and a South African company- Group Five, which saw road tolls being erected and operationalised to fund Zimbabwean highway infrastructure. The paper established that despite this PPP arrangement being a success, as seen by the faster completion of the trunk roads, lower project lifecycle costs, better risk allocation, faster implementation of public works and services, improved service quality and additional revenue streams a myriad of operational and administrative challenges equally dogged it. To this effect, the paper, therefore, recommends some strategies to strengthen and enhance the adoption, operationalization, and management of PPPs for road tolling and highway infrastructure investments in developing countries.
Clean, sufficient water is becoming increasingly scarce worldwide, particularly in African metropolitan areas. Today's urban water systems face several challenges, including, among other things, migration from rural to urban areas, climate change, natural disasters, and a lack of institutional capacity, expertise, and financial and human resources. As a result, governments across Africa are struggling to meet constitutional requirements to provide clean and sufficient water and sanitation. This article aims to investigate the value of public-private partnerships (PPPs) in improving Africa's urban water infrastructure. The research in this article was qualitative. Data were gathered through a literature review, and conceptual analysis was used. The findings show that a variety of factors are at work.
In spite of the rise in the global adoption of public private partnerships, developing countries have failed to attract private investments in equally measure as their developed partners. This has impacted on infrastructural financing in developing countries. The current study sought to establish how market risks influence the performance of public private partnership renewable energy projects. The study adopted a pragmatic paradigm and employed a mixed methods approach, correlational and descriptive survey design. Quantitative data was collected by use of a self-administered questionnaire and while an interview guide was used to collect qualitative data after piloting and reliability established. A sample size of 263 respondents was drawn from a target population of 769 using the Yamane formula. For descriptive statistics the study used the mean and standard deviation. For inferential statistics the study used Pearson’s Product Moment Correlation (r) and Multiple Regression while the F-tests were used in hypothesis testing. The study established a significant influence of market risks on the performance of public private partnerships renewable energy projects F (1,204) =104.689, P=0.000? 0.05. H0 was consequently rejected. Based on this finding the study recommends hedging measures to promote public private partnerships
Source coverage refers to this result set; a publication may occur in several sources. Sync times refer to contributing journals.
Missing abstracts: 0 · Missing authors: 0 · Missing publication dates: 0 · Dates without day precision: 0
| Source | Most recent successful journal sync | Latest attempt |
|---|---|---|
| crossref | 21 Oct 2026 07:22 UTC · ijrbs | complete · ijrbs · 21 Oct 2026 07:22 UTC |
| ojs-rest | 21 Oct 2026 07:22 UTC · ijrbs | complete · ijrbs · 21 Oct 2026 06:46 UTC |
| oai-pmh | 20 Oct 2026 19:55 UTC · ijrbs | complete · ijrbs · 20 Oct 2026 19:50 UTC |
| openalex-enrichment | 21 Oct 2026 07:23 UTC · ijrbs | complete · ijrbs · 21 Oct 2026 07:22 UTC |